Wagon industry running out of steam as Railway orders dry up

The domestic wagon industry, stuck with its sole client – the Indian Railways – appears to be running out of steam in the present economic situation.

Procurements have dwindled affecting profitability and creating over capacity. During the economic slowdown, corporate orders first dried up; after 2009-10, the own-your-own wagon programme got derailed for want of takers among the bulk commodity users.

The industry’s attempts to diversify into Railway coach (EMU/MEMU) manufacturing also faced mid-course troubles, as the Railways put brakes on its long-term capacity building plans.

The top two industry players currently could achieve around 20 per cent of their turnover by diversifying into non-Railway businesses. Incidentally, corporate orders for wagons in four years to 2010 totalled 10,000 units. The industry received the last order of 17,000 wagons for 2011-12 from the Railways.

According to industry sources, beginning Q4 of FY12, the release of orders continued till Q1 of 2013-14, when Cimmco Ltd one of the three listed players — received an order for 514 wagons. Texmaco Rail — the largest among over half a dozen local players — got the biggest order of 3,915 units.

Texmaco Rail, with a capacity of 800 units-a-month, took 4-5 months to execute the order in 2012-13. Since then, its wagon production capacity has been idling. Texmaco has decided to focus more on exports and diversification in view of the erratic procurement programme of the Railways and substantial under-utilisation of capacity set up with significant capital cost.

Some of the industry players had identified exports and diversification into related structural engineering businesses as the alternative route to keep their business wheels running.

Last fiscal, 31 per cent of Texmaco Rail’s turnover came from exports, which helped maintain its profitability during 2012-13. But, Titagarh Wagons Ltd, with insignificant exports, saw its operating profit decline 54 per cent last fiscal. Industry watchers think gaining a firm footing in the export market takes time. “Overcoming cross border tariff and technology hurdles are major constraints,” said a senior official of an industry unit.

Acquisition

TWL, through the acquisition of an ailing but technology-rich French unit, has been trying to be on track in the highly competitive European market for the last three years. It met with moderate success.

“There is future potential for turning this unit as TWL’s technology engine. It may also help it in accessing other markets such as Africa or Latin America,” an analyst remarked.

Cimmco Ltd, which recovered from its sickness in 2011-12 to make a profit of Rs 4.19 crore, reported a loss of Rs 10 crore in 2012-13 for want of adequate orders. Now, controlled by TWL, Cimmco employs 450 at its manufacturing unit. “Increasing cost of manufacturing is also an issue that is affecting the margins,” an industry insider said.

Umesh Choudhary, MD, TWL, said the plans that had been taken up in the last few years for diversification and collaboration related to Indian Railways purchases, had to be shelved.

Listed players such as Texmaco, TWL and Cimmco have been hovering a little above their year-lows and way below their year-highs.

Smaller unlisted players such as Burn Standard, Braithwaite and Jessop, who entirely depend on Railways, however, are most-affected due to lack of orders.

jayanta.mallick@thehindu.co.in

http://www.thehindubusinessline.com/industry-and-economy/logistics/wagon-industry-running-out-of-steam-as-railway-orders-dry-up/article5075967.ece

Rlys may acquire Burn Standard’s wagon units

KOLKATA: With Mamata Banerjee stepping into the engine room, the Railways plan to buy wagon-making units of ailing Burn Standard seems to be swiftly
gaining momentum. Lately, the Railway Board officials have been dropping into town regularly to take stock of the company’s operations. Something that has fired hopes across the industry circles that a fast track transfer of assets could well be one of Ms Banerjee’s Rail Budget proposals.

A subsidiary of Bharat Bhari Udyog Nigam (BBUNL), Burn Standard, comes under the department of heavy industries (DHI). When contacted, a Railway Board official told ET: “We’ve had inter-ministerial talks on acquiring Burn Standard. A number of issues like bad debts, among others, need to be sorted out. Once we get the government approvals, we will bring it as a PSU under the Railway ministry.” The firm has about 1,000 employees on its rolls, with managerial staff comprising 10% of it.

“The Railway Board officials are in constant touch with us. The Railways is keen to acquire the Burnpur and Howrah units with a positive net worth through the company’s revival package,” told BBUNL CMD and Burn Standard ex-officio chairman Pramod Kumar to ET.

Such an exercise would involve a debt waiver of Rs 1,200 crore and injection of some Rs 250 crore through sale of surplus land. However, a pending wage revision plan could cost up to Rs 100 crore. The first step towards a fast track assets transfer has already been taken. DHI has recently forwarded the company’s revival plan to the Board for Reconstruction of PSEs (BRPSE). It can be implemented after some necessary clearances and the final Cabinet nod.

The Burn Standard officials confirmed that as part of the ‘due diligence’ exercise, discussions with Railways have centred around details of the company’s facilities and manpower base. “The present climate perhaps offers the most favourable circumstances for the company,” said an official. “While Burn Standard is fully-equipped to upgrade its production facilities to meet Railways accent on new wagon technology, shortage of design engineers is an area of concern,” added Mr Kumar.

http://economictimes.indiatimes.com/News/News-By-Industry/Transportation/Railways/Rlys-may-acquire-Burn-Standards-wagon-units/articleshow/4650880.cms